Descrizione
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
3 Commentos
Chiusa Wes (Utente registrato)
angelibruck@aol.com (Utente registrato)
Department of Public Works (Ufficialità verificata)