Ashfield City Council

Open Issues: 7 Temas cerrados: 2 Temas Reconocidos: 0
Watching issues created after: 2013-07-29

Ashfield City Council by email submission

Notified About

  • 27 Dobroyd Parade Haberfield NSW 2045, Australia - Ashfield
    Tree roots have damaged the path surface on the Bay Walk city bound in several locations in this area.
  • 36 Frederick Street Ashfield, New South Wales - Ashfield
    Travelling north, on the left, an uncovered drain appears for about 2 houses, it poses a danger to cyclist who are riding towards the left of the road. Accidents have happened. This is potentially exacerbated by an island in the centre of the road that causes vehicles to shift slightly to the left.
  • 39 Frederick Street Ashfield NSW 2131, Australia - Ashfield
    Uncovered drain appears suddenly in the side of the road heading north.
  • Longport Street Summer Hill NSW 2130, Australia - Ashfield
    Vehicles cut the corners and drive through bicycle lanes in entry and exits of roundabout
  • Station Street Ashfield, New South Wales - Ashfield
    The number of bike racks at Ashfield Station is insufficient for the number of cyclists using this station. Is it possible to get some more installed?
  • 2921 Vincent Ave N - Ashfield
    Backyard and side unmowed - weed central
  • Dobroyd Parade Haberfield, New South Wales - Ashfield
    There is a step in the path caused by subsidence or bad construction just where the path from under the Lilyfield Rd bridge meets the path continuing to the Haberfield Rowers Club, at the point where path makes a sharp right turn (heading NW).
  • 24 Holden St Ashfield, New South Wales - Ashfield
    The Telstra pit cover on the footpath is badly seated, causing a trip hazard.
  • Lot 7013 Dobroyd Parade Haberfield, New South Wales - Ashfield
    Eastern end of Hawthorne canal bridge (shared path near AGL installation). In two locations the path has subsided, leaving dangerous holes. Needs asphalting.