Descripción
The Whittier Greenway Trail has been made from disused portions of an old UP Railroad,and as such takes the 2% grade trains need, so that the former tracks are raised in places, notably the bridges at (main thorofares) Norwalk Blvd and '5 Points' =SFS Rd, Whittier & Washington Bls, Pickering Av & La Cuarta St. DIRECT ACCESS IS NEEDED: Handrailed stairs or ramps connecting the trail as briefly as safely possible to the streets (or even old-fash counterweight elevators). The Trail also much needs connection across Pioneer Bl to the SG River Bikeway.
Comentarios